Many business owners are not aware of any facts relating to this new legislation and how it affects your business. Since January 2009, which must be inspected for Commercial HVAC Upgrade Trenton NJ systems for commercial buildings.
Part of the range is described below:
Small scale HVAC systems: all air conditioning systems with a rated output of more than 12 kW must be inspected regularly using the Energy Advisor. Checks must be no more than five years apart.
for all systems first put into operation on 1 January 2008 or later, the first examination must be taken within five years from the date it was put into service for other air conditioning systems, where the effective rated output is more than 250kW the first inspection must take place January 4, 2009 .
Program for checking other air conditioning systems, in which the rated power is more than 12kW the first inspection must take place from 4 January 2011 to January 4, 2011, if the person responsible for the management of change in the air-conditioning system, a new person in control is not given inspection report, the new person in control of the system must ensure that the air conditioning system is inspected within three months from the date on which the person assumes control of the air conditioning system in the building.
Only air conditioning systems with a rated output of more than 12 kW are affected by this legislation.
F Gas Inspections
F gas leak test calendar graduated in accordance with the amount of F gas contained in the application as follows: At least once every 12 months for applications containing 3 kg or more of fluorinated greenhouse gases (this is not to apply to equipment with hermetically sealed systems, which are labeled as such and contain less than 6 kg of fluorinated gases). At least once every 6 months for applications containing 30 kg or more of fluorinated greenhouse gases, at least once every three months for applications containing 300 kg or more of fluorinated gases. All such requests must also check for leaks within 1 month after a leak has been repaired to repair has been effective in the fluorinated gases. If your company uses a system of this type is recommended that you check your plant as soon as possible.
Air Conditioning Energy Assessors
Air conditioning will investigate cooling and air conditioning systems as part of a related controls. The consultant will also examine any documentation that will help you to understand the system and indicates to what extent were maintained or improved systems. It also requires the inspector to assess whether the system is properly sized for the cooling load in the treated areas, and provide advice on ways they can improve the performance of the asset owner. Access is required for all devices that can be placed in the machine room ventilation or outside the building, including the roof of the premises and other locations with limited access ustanovení.Klimatizace inspectors report will also contain recommendations listed in the checklist describes enhancements, fixes, and enhancements to the system in case needs.
Air conditioning is now mandatory in Trenton, New Jersey, it is recommended that if your business that installed the air conditioner had checked immediately.